Commercial Projects

UK’s first BREEAM (2014) “Outstanding” Building

UK’s First BREEAM (2014) “Outstanding” Building, South Lanarkshire College, East Kilbride Heating System – Ground Source Heat Pump installed by Anderson Floor Warming and Renewables (NIBE F1345 A+++ rated): six 200m deep boreholes extract 8°C from the ground. Low-energy, low-temperature heating system runs at 35°C. Output 40kW of heat if required. Want to know how we can help install low-energy renewable…

The Altum Building

Architect – Cooper Cromar Main Contractor – Speyroc Construction Ltd Located in the 61 acre West of Scotland Science Park, the Altum Building is an energy efficient, two storey pavilion housing 16,800ft² of high quality office accommodation. Anderson Floor Warming And Renewables were responsible for the design, supply and installation of the underfloor heating system including insulation and screed. Above…

Banchory West Church

The heating system was upgraded in the restoration of Banchory West Church. A dual boiler system installed by Anderson Floor Warming And Renewables supplies an underfloor heating system to the ground floor and radiators to the ground floor and all other areas. The underfloor heating on the ground floor utilises our pipe in plate system on the traditional joisted floor…

Clydebuilt SECC

With The Hydro providing another large venue at the SECC in Finnieston, a new restaurant/bar has been created within the existing SECC building to cater for customers before and after events. An area next to the east entrance was used for the new bar/restaurant. After digging up and removing the existing floor, Anderson Floor Warming And Renewables laid the underfloor…

Dumfries House

We were contracted by Hope Homes (Hope South West) to design, supply and install a district heating and domestic hot water system consisting of 1no. Dimplex high temperature LA 26 PS air to water heat pump to provide domestic hot water throughout all 7no. holiday rental units and 1no. LA 60TU air to water heat pump to provide low temperature…

Children’s Home, Inverurie

Architect –Aberdeenshire Council Services Engineers –Aberdeenshire Council Main Contractor –CHAP Construction Mechanical Contractor –Sparks Mechanical Services A new building to replace the existing children’s home adjacent to it. Anderson Floor Warming And Renewables designed, supplied and installed a ground source heat pump and underfloor heating system. The ground source heat pump is a Nibe Fighter 1345 with energy provided from…