Bunnahabhain Distillery
Anderson Floor Warming was contracted to complete the heating and hot water system at the new visitor center at Bunnahabhain Distillery on Islay.
The design includes a coastal 14kW Mitsubishi Ecodan air source heat pump, installed to MCS standards, coupled with both a hot water cylinder for the hot water and a buffer vessel for the heating.
The heat load of the building is met by using underfloor heating, coupled with pre-heated mechanical ventilation. The system was installed on a reinforced mezzanine deck, to reduce the footprint and increase the usable area within the building.
Anderson Floor Warming was contracted to complete the heating and hot water system at the new visitor center at Bunnahabhain Distillery on Islay.
The design includes a coastal 14kW Mitsubishi Ecodan air source heat pump, installed to MCS standards, coupled with both a hot water cylinder for the hot water and a buffer vessel for the heating.
The heat load of the building is met by using underfloor heating, coupled with pre-heated mechanical ventilation. The system was installed on a reinforced mezzanine deck, to reduce the footprint and increase the usable area within the building.