Drop Off Building Edinburgh Airport

The drop off / fast park building at Edinburgh airport was a project involving tight timescales and a rigorous schedule. Anderson Floor Warming was contracted to install the heating and cooling system as well as the insulation, screed and the floor surface within the plant room. The heat pump that was used at this project was a Climaveneta unit, which is able to monitor the temperature and humidity in the building and switch between heating and cooling, and this unit supplies an underfloor heating system within the concourse area.